Company Active LTD

Company profile

Costain Oil, Gas & Process Limited

Home | Costain

Costain helps to improve peoples lives through smart infrastructure solutions to meet urgent national needs across the UKs energy, water and transportation infrastructures.

CRN
00786418
Founded
1964
Age
62

Overview

Legal name
COSTAIN OIL, GAS & PROCESS LIMITED
Region
London
Registered address
SEVENTH FLOOR
70 ST MARY AXE
LONDON
UNITED KINGDOM
EC3A 8BE
Insolvency history
No

Company events

Reference milestones and recent Companies House filing stream events.

5 events
30 Sep
2027

Accounts due

Accounts Due

Next accounts due date

20 Feb
2027

Confirmation statement due

Confirmation Due

Next confirmation statement due date

06 Feb
2026

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Dec
2025

Accounts filed

Accounts

Last accounts made up date

01 Jan
1964

Incorporated

Inception

Company registered at Companies House

Public funding

9 awards
First funded
2013
Funded years
2013, 2015, 2017, 2020, 2021
Age at first award
49 years

Projects

2021 Collaborative R&D Lead participant

South Wales Industrial Cluster - Phase 2 Deployment

1 Mar 2021 to 29 Feb 2024

Awarded
£237,088
Total cost £474,174

The South Wales Industrial Cluster (SWIC) is a diverse mix of critical industry from the Pembrokeshire coastline to the Welsh/English border. They have converged with common objectives for decarbonisation and clean growth. Some of the sectors represented include: §Steel making§Oil Refining§Power§Nickel manufacturing§Insulation manufacturing§Chemical§LNG i...

2020 Collaborative R&D Lead participant

South Wales Industrial Cluster

1 Apr 2020 to 30 Sep 2020

Awarded
£37,766
Total cost £75,532

Awaiting Public Project Summary

2020 Collaborative R&D

Roadmap - South Wales Industrial Cluster (SWIC) Phase 1

1 Apr 2020 to 31 Jul 2020

Awarded
£1,448
Total cost £2,897

The South Wales Industrial Cluster (SWIC) is a cluster of diverse industrial companies and sites across South Wales who have come together to collaboratively tackle common challenges of decarbonisation and clean growth. SWIC comprises of a diverse set of industries with both common and unique challenges. Sectors represented include steel, oil refining, pa...

2017 Small Business Research Initiative Lead participant

Stabilisation, Excavation and Segregation

1 Aug 2017 to 31 Oct 2017

Awarded
£49,309
Total cost £49,309

Dismantling process equipment and supporting steel in nuclear cells is made complex by the requirement to carry out multiple steps in a hazardous environment where working times are limited. Eliminating as many of these steps from the dismantling process as is practical has the effect of accelerating dismantling, leading to improvements in productivity an...

2017 Feasibility Studies

Smart Map - Interactive Virtual Engineering

1 Feb 2017 to 31 Aug 2017

Awarded
£5,380
Total cost £10,760

Autonomous drones are revolutionising the way we perform surveys, allowing us to accurately recreate nuclear sites digitally. Being able to examine nuclear sites digitally enables better, more informed decision making, safer operational practises and more effective planning and communications. Smart Map is a cloud based 3D map that unlocks the potential o...

2015 Collaborative R&D

D:EEP : Estimating Entrained Products

1 Apr 2015 to 30 Jun 2018

Awarded
£181,838
Total cost £363,678

Dealing with nuclear legacy is expensive. A universal challenge found at many nuclear facilities is that associated with the management of entrained radioactivity within the walls of nuclear waste storage facilities found on many nuclear sites. Correct classification of the waste can significantly improve the planning process for decommissioning and the r...

2015 Collaborative R&D Lead participant

Thermal Treatment of Irradiated Graphite

1 Apr 2015 to 30 Sep 2017

Awarded
£129,042
Total cost £267,001

A key challenge in the decommissioning of UK and international nuclear facilities is the management of irradiated graphite. Graphite is used as a neutron moderator, reflector, etc in most of the UK’s reactors , and is a very bulky material which is difficult to remove intact from the reactor core at the end of life. If it is removed from the core it repre...

2013 Collaborative R&D

Treatment of Irradiated Graphite – ‘From Core to Capture’

1 Jun 2013 to 30 Apr 2016

Awarded
£105,761
Total cost £211,317

Irradiated graphite is one of the key challenges in decommissioning and radioactive waste management of UK and international legacy nuclear facilities. Graphite is a very bulky form of radioactive waste which is difficult to remove from the reactor core at the end of life. If it is removed from the core it represents a large, and hence expensive, waste st...

2013 Collaborative R&D Lead participant

Plasma Vitrification of Intermediate Level Waste

1 May 2013 to 30 Apr 2015

Awarded
£200,573
Total cost £500,681

Costain Energy and Process and Tetronics are working together to develop a treatment method for Intermediate Level Waste using a DC Plasma system. Although DC plasma treatment is established for hazardous waste treatment it is not yet in commercial use for ILW. It is proposed to design, build and demonstrate operation of a ‘nuclear aligned’ DC plasma vitr...

Product types

Collaborative R&D Feasibility Studies Small Business Research Initiative