Company Active LTD

Company profile

Applied Inspection Limited

Applied Inspection Ltd Non destructive testing, materials testing, consultancy, welding

Applied Inspection Limited is a UK company with status active founded in 1984 based in East Midlands.

CRN
01792147
Founded
1984
Age
42

Overview

Legal name
APPLIED INSPECTION LIMITED
Region
East Midlands
Registered address
SIXTH FLOOR CAVENDISH BUILDING
1 AGARD STREET
DERBY
DERBYSHIRE
ENGLAND
DE1 1DZ
Insolvency history
No

Company events

Reference milestones and recent Companies House filing stream events.

9 events
20 Oct
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

30 Sep
2026

Accounts due

Accounts Due

Next accounts due date

06 Oct
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Dec
2024

Accounts filed

Accounts

Last accounts made up date

07 Oct
2024

Confirmation Statement With Updates

Confirmation-statement

CS01 | Transaction MzQzODU1NjcyNGFkaXF6a2N4

Published 07 Oct 2024 08:42

26 Sep
2024

Second Filing Of Confirmation Statement With Made Up Date

Confirmation-statement

RP04CS01 | Transaction MzQzNzAxOTEzM2FkaXF6a2N4

Published 26 Sep 2024 08:46

18 Sep
2024

Change Person Director Company With Change Date

Officers

CH01 | Transaction MzQzNjM2MzMzMmFkaXF6a2N4

Published 18 Sep 2024 09:56

01 Nov
2023

Confirmation Statement With Updates

Confirmation-statement

CS01 | Transaction MzM5ODYxMDY4MGFkaXF6a2N4 | Paper/PDF filed

Published 27 Sep 2024 12:55

16 Feb
1984

Incorporated

Inception

Company registered at Companies House

Public funding

5 awards
First funded
2013
Funded years
2013, 2014, 2015, 2017
Age at first award
29 years

Projects

2017 Collaborative R&D Lead participant

A novel non-destructive testing training system based on wireless probe tracking (TrainNDT)

1 Nov 2017 to 31 Oct 2019

Awarded
£61,987
Total cost £123,974

Non-destructive testing (NDT) is essential for ensuring and maintaining the integrity of structures and systems from aircraft to power stations. NDT operators are trained by practising on specimens with real or artificial flaws. These samples can be rare and/or expensive. For training at clients’ premises, NDT trainers must carry samples to the training l...

2015 Collaborative R&D

UNION (Ultrasonic Nuclear InspectiON)

1 Apr 2015 to 31 Mar 2018

Awarded
£135,559
Total cost £225,931

The goal is to achieve nondestructive inspection (NDI) of nuclear power generation and reprocessing plant pipework carrying cooling water or generator steam, along pipe runs that are embedded in concrete, buried underground and/or clad in protective coatings such as plastic or bitumen. Key examples are (i) primary coolant and steamline pipework passing re...

2014 Collaborative R&D

INMAP - Industrialisation of Novel MarBN Steel for Advanced Power Plants

1 Jun 2014 to 31 May 2016

Awarded
£59,503
Total cost £99,170

MarBN steels are the most promising approach to increasing the temperature capability of creep resistant martensitic steels to above 620 C. Previously, MarBN steel has been successfully developed in the TSB project, IMPACT (2010-2013) and showed significant improvements in creep strength (20-40%) compared to the current state-of-the-art steels, Grade 92 a...

2014 Collaborative R&D Lead participant

Automated in service and permanent prevention, removal and detection of vessel hull fouling using a sparse network of guided ultrasound sensors (VESSEL CLEAN)

1 Feb 2014 to 31 Jan 2017

Awarded
£88,564
Total cost £147,607

Hull fouling is the largest contributor to excess fuel consumption and carbon emissions by ships, which can be up to 50% over a year. In spite of a global expenditure of some £6bn pa on fouling prevention and cleaning amongst the global merchant fleet, fouling still costs £8bn pa in additional fuel costs and produces 70m tonnes of additional carbon dioxid...

2013 Collaborative R&D

MOSAIC (Monitoring, Scanning and Active Inspection of Cables)

1 Dec 2013 to 30 Nov 2016

Awarded
£135,000
Total cost £225,000

There are 29,000km of high voltage overhead transmission cables in the UK, operating in severe conditions of heat and cold, moisture, voltage stress, wind induced vibration, overloads and structural fatigue, all of which can cause catastrophic failure. The MOSAIC project aims to prototype a novel method of combined monitoring and enhancement of the struct...

Product types

Collaborative R&D