Company identity
Company number 02366949
Company profile
UK company 02366949, incorporated on 1 April 1989.
Electricity North West
Electricity North West is the power network operator for the North West of England. We look after the overhead lines, underground cables and substations that make up the electricity network to give you the power you need.
Company number 02366949
Updated 07 Jul 2026 09:49
Reference milestones and recent Companies House filing stream events.
Next accounts due date
Next confirmation statement due date
Last accounts made up date
Last confirmation statement made up date
Company registered at Companies House
1 Oct 2025 to 31 May 2028
As GB warms due to climate change, uptake of Space Cooling (SC) is expected to increase significantly, leading to increased summer peak demands and greater network load for building comfort alongside the electrification of heat. However, SC demand is currently poorly accounted for in distribution network planning using limited modelling. Additionally, SC'...
1 Oct 2025 to 31 Mar 2026
Non-Technical Losses (NTL) are electricity losses resulting from theft, unknown unmetered supplies, or metering inaccuracies. They directly impact on both customers' bills and our carbon footprint. Losses due to theft also often lead to serious safety incidents. Current methods of identifying and monitoring losses are outdated and inefficient. I-LAD Servi...
1 Oct 2024 to 30 Apr 2025
As Britain warms due to climate change, electrification of heat will mean increasing customer access to Space Cooling (SC) leading to increased summer peak demands. In current distribution network planning cooling demand is currently poorly accounted for and based on limited, high-level modelling. Additionally, cooling's potential to provide flexibility d...
1 Oct 2024 to 31 Mar 2025
Fractal Flow (FF) addresses challenges for both the National Grid Electricity System Operator (NGESO) and Distribution Network Operators (DNOs). NGESO currently has limited visibility of aggregated demand forecasts, services availability, and headroom at and below Grid Supply Points (GSPs). As DNOs shift to flexible demand and supply services, FF provides...
1 Sep 2024 to 30 Sep 2028
no public description
1 Mar 2024 to 31 May 2024
1 Mar 2024 to 31 May 2024
1 Oct 2023 to 31 Mar 2024
1 Oct 2023 to 31 Mar 2024
1 Oct 2023 to 31 Mar 2024
1 Oct 2023 to 31 Mar 2024
3 Apr 2023 to 3 Jul 2023