Electricity North West Limited

UK company 02366949, incorporated on 1 April 1989.

Electricity North West

Electricity North West is the power network operator for the North West of England. We look after the overhead lines, underground cables and substations that make up the electricity network to give you the power you need.

Company number
02366949
Incorporated
1 Apr 1989
Companies House status
Active

Company identity

Founded / incorporated
1 April 1989

Company number 02366949

Verify at Companies House
Legal name
ELECTRICITY NORTH WEST LIMITED
Company type
Private Limited Company
Region
North West England
Registered address
ELECTRICITY NORTH WEST
BORRON STREET
STOCKPORT
ENGLAND
SK1 2JD
Insolvency history
No

Corporate ownership

Updated 07 Jul 2026 09:49

10 levels 2 ultimate controllers Controls 3
1
Company Active LTD
Electricity North West Limited
CRN 02366949
2
Direct controller Active PLC
3
Intermediate controller Active LTD
Nwen Group Limited
CRN 06872880
4
Intermediate controller Active LTD
5
Intermediate controller Active LTD
6
Intermediate controller Active LTD
7
Ultimate controller
00099259
CRN 00099259
8
Intermediate controller Active LTD
9
Intermediate controller Active PLC
Scottish Power UK PLC
CRN SC117120
10
Intermediate controller Active LTD
Scottish Power Limited
CRN SC193794
11
Intermediate controller Active LTD
12
Ultimate controller
BI-167-A
CRN BI-167-A

Company events

Reference milestones and recent Companies House filing stream events.

5 events
30 Sep
2027

Accounts due

Accounts Due

Next accounts due date

25 Oct
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

31 Dec
2025

Accounts filed

Accounts

Last accounts made up date

11 Oct
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

01 Apr
1989

Incorporated

Inception

Company registered at Companies House

Public funding

15 awards
First funded
2019
Funded years
2019, 2020, 2023, 2024, 2025
Age at first award
29 years

Projects

2025 Collaborative R&D Lead participant

CoolDown

1 Oct 2025 to 31 May 2028

Awarded
£1,321,723
Total cost £1,469,397

As GB warms due to climate change, uptake of Space Cooling (SC) is expected to increase significantly, leading to increased summer peak demands and greater network load for building comfort alongside the electrification of heat. However, SC demand is currently poorly accounted for in distribution network planning using limited modelling. Additionally, SC'...

2025 Collaborative R&D

I-LAD - Alpha [Innovating Losses Analysis and Detection] [R4 Alpha]

1 Oct 2025 to 31 Mar 2026

Awarded
£20,367
Total cost £22,630

Non-Technical Losses (NTL) are electricity losses resulting from theft, unknown unmetered supplies, or metering inaccuracies. They directly impact on both customers' bills and our carbon footprint. Losses due to theft also often lead to serious safety incidents. Current methods of identifying and monitoring losses are outdated and inefficient. I-LAD Servi...

2024 Collaborative R&D Lead participant

CoolDown

1 Oct 2024 to 30 Apr 2025

Awarded
£61,637
Total cost £70,847

As Britain warms due to climate change, electrification of heat will mean increasing customer access to Space Cooling (SC) leading to increased summer peak demands. In current distribution network planning cooling demand is currently poorly accounted for and based on limited, high-level modelling. Additionally, cooling's potential to provide flexibility d...

2024 Collaborative R&D

Fractal Flow (R3A)

1 Oct 2024 to 31 Mar 2025

Awarded
£1
Total cost £5,520

Fractal Flow (FF) addresses challenges for both the National Grid Electricity System Operator (NGESO) and Distribution Network Operators (DNOs). NGESO currently has limited visibility of aggregated demand forecasts, services availability, and headroom at and below Grid Supply Points (GSPs). As DNOs shift to flexible demand and supply services, FF provides...

2024 Collaborative R&D

SHIELD

1 Sep 2024 to 30 Sep 2028

Awarded
£43,110
Total cost £47,900

no public description

2024 Feasibility Studies Lead participant

CoolDown

1 Mar 2024 to 31 May 2024

Awarded
£0
Total cost £33,188
2024 Feasibility Studies Lead participant

LDES NODE

1 Mar 2024 to 31 May 2024

Awarded
£0
Total cost £29,466
2023 Collaborative R&D Lead participant

Net Zero Terrace

1 Oct 2023 to 31 Mar 2024

Awarded
£0
Total cost £0
2023 Collaborative R&D Lead participant

Retrometer

1 Oct 2023 to 31 Mar 2024

Awarded
£0
Total cost £0
2023 Collaborative R&D

SHIELD - Smart Heat and Intelligent Energy in Low-Income Districts

1 Oct 2023 to 31 Mar 2024

Awarded
£0
Total cost £0
2023 Collaborative R&D

Whole Energy System Resilience Vulnerability Assessment (WELLNESS)

1 Oct 2023 to 31 Mar 2024

Awarded
£0
Total cost £0
2023 Feasibility Studies Lead participant

REWIRE (REsidential Whole System Integrated REsilience)

3 Apr 2023 to 3 Jul 2023

Awarded
£94,997
Total cost £107,889

Product types

Collaborative R&D CR&D Bilateral Feasibility Studies