Company Active PLC

Company profile

Northern Powergrid (Northeast) PLC

Northern Powergrid (Northeast) PLC is a UK company with status active founded in 1994 based in North East England.

CRN
02906593
Founded
1994
Age
32

Overview

Legal name
NORTHERN POWERGRID (NORTHEAST) PLC
Region
North East England
Registered address
LLOYDS COURT
78 GREY STREET
NEWCASTLE UPON TYNE
NE1 6AF
Insolvency history
No

Corporate ownership

Updated 07 Jul 2026 09:49

5 levels 1 ultimate controller Controls 1
1
Company Active PLC
Northern Powergrid (Northeast) PLC
CRN 02906593
2
Direct controller Active PLC
Northern Electric PLC
CRN 02366942
3
Intermediate controller Active LTD
4
Intermediate controller Active PRIVATE-UNLIMITED
5
Intermediate controller Active PRIVATE-UNLIMITED
6
Ultimate controller
02908471
CRN 02908471

Company events

Reference milestones and recent Companies House filing stream events.

6 events
30 Jun
2027

Accounts due

Accounts Due

Next accounts due date

23 Mar
2027

Confirmation statement due

Confirmation Due

Next confirmation statement due date

09 Mar
2026

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Dec
2025

Accounts filed

Accounts

Last accounts made up date

09 Oct
2024

Auditors Resignation Company

Auditors

AUD | Transaction MzQzODg4NDIwNGFkaXF6a2N4 | Paper/PDF filed

Published 15 Oct 2024 06:17

09 Mar
1994

Incorporated

Inception

Company registered at Companies House

Public funding

17 awards
First funded
2015
Funded years
2015, 2018, 2023, 2024, 2025, 2026
Age at first award
20 years

Projects

2026 Feasibility Studies Lead participant

Social VPP

1 Feb 2026 to 31 May 2026

Awarded
£10,935
Total cost £12,150

The Social Virtual Power Plant (Social VPP) empowers vulnerable and fuel-poor households to actively participate in the energy transition. By combining community-led investment with smart flexibility software, the project aggregates household batteries and demand response to lower bills, reduce carbon emissions, and strengthen grid resilience. Unlike trad...

2026 Feasibility Studies Lead participant

Smart Open Load Visibility Exchange - SOLVE

1 Jan 2026 to 30 Apr 2026

Awarded
£14,040
Total cost £15,600

Electricity networks face new challenges from electric vehicles, heat pumps and solar. These low-carbon technologies are vital for net zero but can strain local grids --- high voltages waste solar energy, while low voltages trip EV chargers. Project SOLVE builds on Ofgem's and NESO's innovation programmes, using open standards and smart meter data to prov...

2025 Feasibility Studies

Hot Chips

1 May 2025 to 31 Aug 2025

Awarded
£5,670
Total cost £6,300

Electricity demand from heating could quadruple by 2050 to over 100TWh per year, almost a third of GB's current annual electricity demand. Hot Chips will demonstrate how data centre surplus heat could reduce the energy demand of district heat (DH) networks and explore how DNOs and data centres can work collaboratively to decarbonise DH networks. Using wat...

2024 Collaborative R&D Lead participant

Cross Vector Hub (R3A)

1 Nov 2024 to 30 Apr 2025

Awarded
£25,920
Total cost £28,800

Cross-Vector Energy Hubs can leverage the flexibility of both Electrical and Gas technologies to support the electricity system and release grid capacity via coordination of these parallel energy vectors. The project builds and demonstrates a planning and simulation toolset that evaluates the Cross-Vector Energy Hub, allowing both DNOs and prospective Ene...

2024 Collaborative R&D Lead participant

Multi Resilience

1 Oct 2024 to 30 Jun 2028

Awarded
£3,554,857
Total cost £5,320,050

no public description

2024 Collaborative R&D Lead participant

Fractal Flow (R3A)

1 Oct 2024 to 31 Mar 2025

Awarded
£29,500
Total cost £33,300

Fractal Flow (FF) addresses challenges for both the National Grid Electricity System Operator (NGESO) and Distribution Network Operators (DNOs). NGESO currently has limited visibility of aggregated demand forecasts, services availability, and headroom at and below Grid Supply Points (GSPs). As DNOs shift to flexible demand and supply services, FF provides...

2024 Feasibility Studies Lead participant

Cross Vector Energy Hub

1 Mar 2024 to 31 May 2024

Awarded
£0
Total cost £8,400
2023 Collaborative R&D Lead participant

Artificial Forecasting

1 Oct 2023 to 31 Mar 2024

Awarded
£0
Total cost £0
2023 Collaborative R&D Lead participant

Flexible Queue Management (Alpha)

1 Oct 2023 to 31 Mar 2024

Awarded
£0
Total cost £0
2023 Collaborative R&D

Hydrogen Cost Reduction (HyCoRe )

1 Oct 2023 to 31 Mar 2024

Awarded
£0
Total cost £0
2023 Collaborative R&D Lead participant

Inform

1 Oct 2023 to 31 Mar 2024

Awarded
£0
Total cost £0
2023 Collaborative R&D

Net Zero Terrace

1 Oct 2023 to 31 Mar 2024

Awarded
£0
Total cost £0

Product types

Collaborative R&D Feasibility Studies