Company Active LTD

Company profile

Advanced Design Technology Limited

Advanced Design Technology | Turbomachinery Design Software

ADT's unique turbomachinery design software uses a 3D Inverse Design method to create breakthrough pump, fan, compressor and turbine designs.

CRN
03636794
Founded
1998
Age
27

Overview

Legal name
ADVANCED DESIGN TECHNOLOGY LIMITED
Region
London
Registered address
80-86 GRAYS INN ROAD
80-86 GRAYS INN ROAD
LONDON
ENGLAND
WC1X 8NH
Insolvency history
No

Company events

Reference milestones and recent Companies House filing stream events.

9 events
07 Oct
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

30 Sep
2026

Accounts due

Accounts Due

Next accounts due date

23 Sep
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Dec
2024

Accounts filed

Accounts

Last accounts made up date

18 Nov
2024

Appoint Person Director Company With Name Date

Officers

AP01 | Transaction MzQ0MzcxMTUyMmFkaXF6a2N4

Published 18 Nov 2024 12:55

18 Nov
2024

Confirmation Statement With No Updates

Confirmation-statement

CS01 | Transaction MzQ0MzcxMzQzNGFkaXF6a2N4

Published 18 Nov 2024 01:10

17 Nov
2024

Termination Director Company With Name Termination Date

Officers

TM01 | Transaction MzQ0MzY2MzA4NmFkaXF6a2N4

Published 17 Nov 2024 10:24

04 Nov
2024

Change Registered Office Address Company With Date Old Address New Address

Address

AD01 | Transaction MzQ0MTg3NDgzN2FkaXF6a2N4

Published 04 Nov 2024 11:04

23 Sep
1998

Incorporated

Inception

Company registered at Companies House

Public funding

3 awards
First funded
2015
Funded years
2015, 2016, 2017
Age at first award
16 years

Projects

2017 Feasibility Studies Lead participant

TURBOdesign2 Throughflow solver (TD2-TF)

1 Jul 2017 to 30 Jun 2018

Awarded
£49,888
Total cost £99,776

The TURBOdesign2 Throughflow solver (TD2-TF) project will address the theme of ‘Engineering’ by enhancing the capabilities of an existing software design tool to explore a new market opportunity and to respond to customer’s needs. By targeting the turbofan and the turbine power generation sectors the project will also address the themes of ‘Transport – ae...

2016 Collaborative R&D Lead participant

High Pressure EGR Generator (HiPERGen)

1 Oct 2016 to 30 Nov 2018

Awarded
£132,263
Total cost £244,463

The High Pressure Exhaust Gas Recirculation Generator (HiPERGen) project will develop a novel recovery system that will be integrated into the high pressure exhaust gas recirculation (EGR) loop to utilise the un-used throttling energy for electricity generation using a turbine coupled with a high speed generator and achieving up to 3 % WLTP CO2 reduction....

2015 Collaborative R&D

Mechanically Decoupled Electric Turbocharger for Optimal IC Engines Efficiency

1 Sep 2015 to 30 Nov 2017

Awarded
£124,677
Total cost £249,604

The project will develop a novel energy recovery and boosting system for internal combustion engines, leading to a step change in vehicle energy efficiency, fuel consumption and CO2 emissions. Aeristech’s Full Electric Turbocharger Technology (FETT) is a mechanically decoupled turbochaqrger and comprises of 3 elements; (1) an electric turbine generator re...

Product types

Collaborative R&D Feasibility Studies