UK company 04094290, incorporated on 23 October 2000.
SAVE Project
The innovative SAVE programme evaluates the potential for domestic customers to actively participate in improving the resilience of electricity distribution networks.
Company number 04094290
Updated 07 Jul 2026 09:49
Reference milestones and recent Companies House filing stream events.
Next confirmation statement due date
Next accounts due date
TM01 | Transaction MzUyOTg1MTE4N2FkaXF6a2N4
Published 01 Jul 2026 13:12
Last confirmation statement made up date
Last accounts made up date
Company registered at Companies House
1 Jan 2026 to 31 Mar 2026
Britain's race to electrify our transport and heat is reshaping every street, yet open trenches slow the journey, increase costs and disrupt the lives of millions. By 2035 every new car will be electric and heat pumps installations could reach 1.5 million installations/ year. Utilities already dig up Britain's roads four million times per year at an enorm...
1 Jan 2026 to 31 May 2026
**DIME (Demand Insights for Metered Enterprises** tackles a critical data gap for small and medium-sized enterprises (SMEs) with non-half-hourly metering, particularly in high street areas. These businesses make up 99.8% of the UK's private sector and are vital to achieving decarbonisation goals, yet DSOs lack visibility of their demand profiles. DIME use...
1 Oct 2025 to 30 Apr 2026
The distribution connections queue is c.180GW and growing, driven by electrification of demand and growth in low-carbon generation and storage. Assessing overall network impacts from this ever-evolving connections stack is challenging, complicating networks' assessment of available headroom and future investment needs. FastTrack, an Artificial Intelligenc...
1 Oct 2025 to 31 Mar 2026
Non-Technical Losses (NTL) are electricity losses resulting from theft, unknown unmetered supplies, or metering inaccuracies. They directly impact on both customers' bills and our carbon footprint. Losses due to theft also often lead to serious safety incidents. Current methods of identifying and monitoring losses are outdated and inefficient. I-LAD Servi...
1 Feb 2025 to 31 May 2025
Electrical Losses are the difference in the energy that enters the electrical network and that which reaches consumers premises. Without intervention losses are forecast to increase with increasing electrification. They not only directly impact on customer's bill and our carbon footprint, but losses due to theft often lead to serious safety incidents. Cur...
1 Jan 2025 to 31 May 2025
The connection request queue is at least 723GW and growing, driven by low-carbon technologies, renewable energy and new developments. Assessing the overall network impact from this volume of applications is challenging, making it difficult to assess available headroom and future investment needs. FastTrack, an AI solution, aims to simulate the impact of b...
1 Oct 2024 to 31 Mar 2025
Our electricity network faces significant challenges from climate change including flooding, overheating and frequent storm-force winds. Traditional grey engineered solutions (e.g. concrete flood defences or cooling systems) are effective but carbon-intensive and provide limited additional benefits. The Nature4Networks project explores Nature-based Soluti...
1 Oct 2024 to 31 Mar 2025
The decarbonisation of the marine sector is likely to drive a substantial surge in national electrical demand. The sector has a critical role in UK economy and supporting island communities, but is also complex, with huge diversity across ports and their stakeholders. Seeking to address this challenge, SeaChange will: \*build a replicable, localised model...
1 Mar 2024 to 31 May 2024
1 Mar 2024 to 31 May 2024
1 Mar 2024 to 31 May 2024
1 Jul 2023 to 31 Oct 2025