Company Active LTD

Company profile

Houlder Limited

Your Partner for a Sustainable Future | Houlder

Specialists in engineering design, clean technology and technical consultancy for marine and offshore - your partner for a sustainable Future

CRN
04400298
Founded
2002
Age
24

Overview

Legal name
HOULDER LIMITED
Region
Unknown
Registered address
LEYTONSTONE HOUSE
3 HANBURY DRIVE
LONDON
ENGLAND
E11 1GA
Insolvency history
No

Latest accounts

Financial period: 1 Jan 2024 to 31 Dec 2024

FULLACCOUNTS
Turnover
Unknown
Profit / Loss
-£562,766
Employees
70

Company events

Reference milestones and recent Companies House filing stream events.

8 events
04 Apr
2027

Confirmation statement due

Confirmation Due

Next confirmation statement due date

30 Sep
2026

Accounts due

Accounts Due

Next accounts due date

02 Apr
2026

Confirmation Statement With No Updates

Confirmation-statement

CS01 | Transaction MzUxMzg5MzA4OWFkaXF6a2N4

Published 02 Apr 2026 13:50

21 Mar
2026

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Dec
2024

Accounts filed

Accounts

Last accounts made up date

10 Sep
2024

Mortgage Create With Deed With Charge Number Charge Creation Date

Mortgage

MR01 | Transaction MzQzNTA1MTA5M2FkaXF6a2N4

Published 16 Sep 2024 11:39

10 Sep
2024

Accounts With Accounts Type Full

Accounts Analysed

AA | Transaction MzQzNTA5MDEyOWFkaXF6a2N4

Published 10 Sep 2024 12:21

21 Mar
2002

Incorporated

Inception

Company registered at Companies House

Public funding

8 awards
First funded
2017
Funded years
2017, 2018, 2021, 2024, 2025
Age at first award
15 years

Projects

2025 Collaborative R&D Lead participant

MOSES AF (Marine Optimised Selector - Energy Savers/ Alternative Fuel)

1 Sep 2025 to 31 Mar 2026

Awarded
£79,143
Total cost £131,904

MOSES AF is a new digital tool being developed to help shipowners identify the best ways to reduce greenhouse gas emissions from their vessels. The tool will allow owners to assess energy-saving technologies (such as wind assistance or propulsion upgrades) and compare alternative fuels (such as methanol, ammonia, or hydrogen), tailored specifically to eac...

2025 Collaborative R&D

Future Low-emission Ammonia Marine Engines (FLAME)

1 Sep 2025 to 31 Mar 2026

Awarded
£35,571
Total cost £59,285

This project will deliver an Ammonia Auxiliary Engine retrofit solution, allowing shipping companies to eliminate auxiliary emissions whilst reducing cost and not adding risk to vessel operations. At the heart of this solution will be the Carnot Engine. Whereas most internal combustion engines are just 25 -- 35% efficient, a Carnot Engine operates at 72% ...

2025 Collaborative R&D

Project MROS: Feasibility of an Optionally Crewed Multi-Role Offshore Support Vessel

1 Aug 2025 to 31 Mar 2026

Awarded
£38,824
Total cost £64,707

Project MROS brings together world-leading British marine engineering capability to deliver a feasibility study focused on the design of a novel and ultra-efficient +32m SWATH hull form for a multi-role Offshore Support Vessel (OSV), aligning with the goals of the CMDC 6 Smart Shipping competition. The core objective is to create a compact and versatile a...

2024 Feasibility Studies Lead participant

COMLink Design tool (Conceptural, Operational Modelling Linked Design Tool)

1 Nov 2024 to 31 Mar 2025

Awarded
£59,160
Total cost £98,600

Houlder is spearheading maritime innovation with the development of the Houlder Optimisation and Modelling Environment (HOME). This project aims to revolutionise the concept design phase of ship development by integrating operational modelling into early design stages by developing our Conceptual, Operational Linked (COMLink) Tool as a part of HOME. By en...

2024 Feasibility Studies

BOSS LEVEL (Battery Optimisation Sensor Systems with Local Environment and Vessel Engineering Learnings)

1 Oct 2024 to 31 Mar 2025

Awarded
£14,551
Total cost £24,251

Tomorrow's decarbonised vessel fleet will require data-rich operation to cope with revolutionary scale shift in all-electric propulsion, on-board battery storage, and alt-fuels. An up-tick in maritime data is vital for: * Optimal efficiency, essential to meet environmental and economic levels of performance * Low-carbon propulsion technologies, notably ba...

2021 Collaborative R&D

Feasibility study into decarbonisation of SOV newbuild and retrofit

1 Sep 2021 to 31 Mar 2022

Awarded
£36,326
Total cost £60,544

This _Feasibility study into decarbonisation of SOV newbuild and retrofit_ is a project to fully realise the ZE new-build and LE retrofit options available to mid-to-large size vessels. Building on Bibby Marine's existing research and development project _MarRI-UK_ _WaveMaster Zero C,_ this new project seeks to build on the knowledge learnt about ZE fuels...

2018 Collaborative R&D

Windfarm Autonomous Ships Project (WASP)

1 Jan 2018 to 31 Dec 2019

Awarded
£75,750
Total cost £126,250

"The UK economic opportunity in offshore wind energy is robust and growing. Further cost reduction is essential to achieve parity with fossil fuel and nuclear energy systems. The application of Robotics and Artificial Intelligence (RAI) is being assessed in all other major sectors. For offshore wind, RAI offers the opportunities to minimise the need to se...

2017 Feasibility Studies

Offshore Platform for Energy Competitiveness (OPEC)

1 Oct 2017 to 31 Dec 2018

Awarded
£18,313
Total cost £30,521

It is acknowledged that foundations costs impose a large cost burden on today's offshore wind and wave energy systems. The OPEC project is addressing the critical cost by advancing a novel concept that would replace traditional foundations, and achieve a 20% reduction in the cost of energy produced by these systems. OPEC comprises a large floating structu...

Product types

Collaborative R&D Feasibility Studies