Company Active LTD

Company profile

GKN Hybrid Power Limited

GKN Hybrid Power Limited is a UK company with status active founded in 2006.

CRN
06005208
Founded
2006
Age
19

Overview

Legal name
GKN HYBRID POWER LIMITED
Region
Unknown
Registered address
2660 KINGS COURT
BIRMINGHAM BUSINESS PARK
BIRMINGHAM
ENGLAND
B37 7YE
Insolvency history
No

Company events

Reference milestones and recent Companies House filing stream events.

15 events
30 Sep
2026

Accounts due

Accounts Due

Next accounts due date

15 Sep
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

25 Jun
2026

Appoint Person Director Company With Name Date

Officers

AP01 | Transaction MzUyODQ4MzU3OWFkaXF6a2N4

Published 25 Jun 2026 09:33

01 Sep
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Dec
2024

Accounts filed

Accounts

Last accounts made up date

10 Oct
2024

Accounts With Accounts Type Full

Accounts PDF pending

AA | Transaction MzQzODQ4OTg4MWFkaXF6a2N4 | Paper/PDF filed

Published 11 Oct 2024 11:38

03 Oct
2024

Appoint Person Director Company With Name Date

Officers

AP01 | Transaction MzQzODEwNDkwNGFkaXF6a2N4

Published 03 Oct 2024 07:13

26 Sep
2024

Termination Director Company With Name Termination Date

Officers

TM01 | Transaction MzQzNzM5NjkwNWFkaXF6a2N4

Published 26 Sep 2024 02:51

02 Sep
2024

Confirmation Statement With No Updates

Confirmation-statement

CS01 | Transaction MzQzNDEzNjA1OWFkaXF6a2N4

Published 02 Sep 2024 11:22

13 Aug
2024

Change To A Person With Significant Control

Persons-with-significant-control

PSC05 | Transaction MzQzMTkwODM4MmFkaXF6a2N4

Published 13 Aug 2024 16:12

13 Aug
2024

Change To A Person With Significant Control

Persons-with-significant-control

PSC05 | Transaction MzQzMTg4NTk5M2FkaXF6a2N4

Published 13 Aug 2024 16:07

12 Aug
2024

Change Registered Office Address Company With Date Old Address New Address

Address

AD01 | Transaction MzQzMTg4NTUyOGFkaXF6a2N4

Published 12 Aug 2024 20:18

12 Aug
2024

Change To A Person With Significant Control

Persons-with-significant-control

PSC05 | Transaction MzQzMTg1ODYxMmFkaXF6a2N4

Published 12 Aug 2024 13:52

12 Aug
2024

Change Registered Office Address Company With Date Old Address New Address

Address

AD01 | Transaction MzQzMTgzMDcwNGFkaXF6a2N4

Published 12 Aug 2024 10:38

21 Nov
2006

Incorporated

Inception

Company registered at Companies House

Public funding

11 awards
First funded
2009
Funded years
2009, 2012, 2014, 2017, 2018, 2020, 2022
Age at first award
2 years

Projects

2022 EU-Funded Lead participant

HEFT - Novel Concept of a low cost, high power density and highly efficient recyclable motor for next generation mass produced electric vehicles

1 Dec 2022 to 31 May 2026

Awarded
£342,703
Total cost £342,703

no public description

2022 Collaborative R&D

SCREAM - Secure Critical Rare Earth Magnets for the UK

1 Mar 2022 to 28 Feb 2025

Awarded
£191,617
Total cost £383,234

NdFeB magnets play a critical role in the fight against climate change as they are used in clean technologies such as wind turbines generators and motors in electric vehicles. As we transition to an electrically driven society then the demand for these materials will increase almost exponentially. The supply of these materials is geographically concentrat...

2020 BIS-Funded Programmes Lead participant

Future Pathway UK: Advanced R&D and Process Development for Integrated eDrive Manufacture

1 Nov 2020 to 30 Jun 2021

Awarded
£61,081
Total cost £122,161

Future Pathway UK, is a collaborative, industry-led feasibility study between GKN Automotive Innovation Centre, Belcan and the University of Nottingham. The purpose of this feasibility study is to assess the viability of UK manufacture of electric drive and power electronics for global mass-market applications and recommend the pathway to achieve a global...

2020 Collaborative R&D

Accelerating the UK E-Machine Preformed Winding Supply Chain

1 Apr 2020 to 30 Jun 2022

Awarded
£166,717
Total cost £463,103

Awaiting Public Summary

2018 Feasibility Studies Lead participant

MiWheel - Motor in Wheel feasibility study

1 Oct 2018 to 30 Sep 2019

Awarded
£31,520
Total cost £63,040

"MiWheel is collaborative, industry led feasibility study, between the GKN Innovation Centre, AVID technology and Warwick Manufacturing Group. The purpose is to assess if 48V battery in wheel electric drive can be made viable for mass market adoption in L/M and CAV class vehicles; define the technology, design and manufacturing processes that will enable ...

2018 BIS-Funded Programmes Lead participant

Advanced Integrated and Cooled Electric Drive - ACeDrive

1 Apr 2018 to 31 Dec 2021

Awarded
£1,743,184
Total cost £5,036,648

The ACeDrive project aims to develop a 2030 generation eDrive power train but for production by 2023, in so doing it will hasten the displacement of the internal combustion engine, enable manufactures both to gain greater range and performance from their vehicles and lower the cost to the consumer. Project ACeDrive consortium is comprised of GKN Innovatio...

2017 BIS-Funded Programmes

HIPERCARII - Enhancing Manufacturability of a High Performance REEV with Microturbine Range Extender

1 Nov 2017 to 31 Mar 2022

Awarded
£252,823
Total cost £505,646

It is forecast that by 2025 40% of passenger vehicle sales will feature some form of electrification. Risk averse global manufacturers need their supply chain to deliver proven, market ready low carbon technologies to meet rapidly changing consumer demands and legislative requirements. HIPERCAR 2 takes the results of successful R&D projects, progressing f...

2014 BIS-Funded Programmes

Gyrodrive Original Equipment Development

1 Apr 2014 to 30 Sep 2017

Awarded
£4,253,050
Total cost £9,885,000

Williams Hybrid Power (WHP), supported by GKN Land Systems, have developed a hybrid system to regenerate braking energy on city buses utilising their Gyrodrive system with a high speed flywheel originally developed for Le Mans Prototypes KERS technology. To date this development work has shown the fuel savings in excess of 25% for the bus operators. In th...

2012 Collaborative R&D

FlySafe - Flywheel-hybrid safety engineering

1 Dec 2012 to 28 Feb 2017

Awarded
£87,584
Total cost £180,214

This project will develop fundamental science, applied engineering knowledge and safety-critical engineering processes, and contribute strongly to creation of a technical standard for, the design, analysis, manufacture and test of composite flywheel energy storage systems for transport applications. By doing so, in an unprecedented collaboration of the UK...

2012 Collaborative R&D

GyroDrive - Flywheel Hybrid System for City Bus and Commercial Vehicle use

1 Oct 2012 to 31 Dec 2014

Awarded
£1,084,371
Total cost £2,170,759

GyroDrive is a game changing hybrid concept for City bus and HGV applications. Despite significant pressure to reduce emissions and improve fuel consumption, the commercial uptake of hybrid buses has been low due the high system cost. Additionally, with a life of up to 20 years, there will be a significant number of diesel buses in service for the forseea...

2009 Collaborative R&D

KinerStor-Kinetic Energy Recovery and storage System

1 Oct 2009 to 31 Mar 2012

Awarded
£370,038
Total cost £767,753

Kinergy delivers a hybridisation system with potential for 30% fuel/C02 saving at an on-cost of below £1000, which will strongly accelerate the mass-market uptake of hybrid vehicles. The program deploys technologies in which the UK has leadership, based on a first generation derived from motorsport. First generation flywheel-hybrids suffer from risks and ...

Product types

BIS-Funded Programmes Collaborative R&D EU-Funded Feasibility Studies