Company Active LTD

Company profile

Zircotec Limited

Performance 1 Coatings

Zircotec Limited is a UK company with status active founded in 2008 based in South East England.

CRN
06758654
Founded
2008
Age
17

Overview

Legal name
ZIRCOTEC LIMITED
Region
South East England
Registered address
FIRST FLOOR 1 DES ROCHES SQUARE
WITAN WAY
WITNEY
OXFORDSHIRE
UNITED KINGDOM
OX28 4BE
Insolvency history
No

Corporate ownership

Updated 06 Jun 2026 16:52

1 level 1 ultimate controller
1
Company Active LTD
Zircotec Limited
CRN 06758654
2
Direct and ultimate controller Active LTD

Company events

Reference milestones and recent Companies House filing stream events.

5 events
30 Sep
2027

Accounts due

Accounts Due

Next accounts due date

07 Dec
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

31 Dec
2025

Accounts filed

Accounts

Last accounts made up date

23 Nov
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

26 Nov
2008

Incorporated

Inception

Company registered at Companies House

Public funding

5 awards
First funded
2017
Funded years
2017, 2019, 2020, 2021, 2024
Age at first award
8 years

Projects

2024 Collaborative R&D Lead participant

CeraBEV - Ceramics for BEVs

1 Sep 2024 to 31 Aug 2025

Awarded
£369,445
Total cost £901,086

The global drive towards a zero-emission transport sector is increasing the demand for Electric vehicles. However, this demand is being tempered by the phenomenon known as range anxiety. As the total vehicle weight has a major impact on range a weight optimised EV battery pack would be really beneficial. The CeraBEV project will develop proprietary cerami...

2021 BIS-Funded Programmes

Brunel: Realising heavy-duty hydrogen thermal engines beyond Euro VII

1 Nov 2021 to 31 Oct 2024

Awarded
£1,206,450
Total cost £1,723,500

Cummins and their partners in the supply chain - BorgWarner, Zircotec and Johnson Matthey - are collaborating to develop a novel zero-CO2 hydrogen internal combustion engine concept (H2-ICE), based on their optimised spark-ignited platform. The Brunel project targets potentially transformative reductions in complexity of a flexible combustion and aftertre...

2020 Feasibility Studies Lead participant

Zircotec POD

1 Jun 2020 to 30 Nov 2020

Awarded
£240,000
Total cost £240,000

no public description

2019 Collaborative R&D Lead participant

Design of testing procedure and Standard for thermal conductivity of multilayered heatshields including plasma applied ceramics to textured surfaces over a range of operating temperatures and conditions including dynamic conditions.

1 Feb 2019 to 31 Mar 2019

Awarded
£24,869
Total cost £35,527

An investigation into the creation of a Testing Standard for the performance of multi-layer composite heatshields in Dynamic rather than Static environments using Thermal Pulse Analysis.

2017 BIS-Funded Programmes

LoCT Low Carbon Tractor

1 Jul 2017 to 30 Sep 2021

Awarded
£1,674,536
Total cost £2,392,190

This project brings together a consortium to improve the performance, autonomy and efficiency of the New Holland concept gas tractor in order to overcome significant technical challenges and bring it to a point of comparison with conventional diesel powered tractors at a commercially viable cost. The tractor is to be as close to a diesel as possible in te...

Product types

BIS-Funded Programmes Collaborative R&D Feasibility Studies