Company Active LTD

Company profile

Ether Nde Limited

Home : ETherNDE

Welcome to ETher NDE. We are a dedicated manufacturer of Eddy Current Testing (ECT) non-destructive testing NDT equipment, probes and accessories design and manufacture company.

CRN
07096393
Founded
2009
Age
16

Overview

Legal name
ETHER NDE LIMITED
Region
East of England
Registered address
ENDEAVOUR HOUSE 18 BRICK KNOLL PARK
ASHLEY ROAD
ST. ALBANS
HERTFORDSHIRE
AL1 5UG
Insolvency history
No

Corporate ownership

Updated 06 Jun 2026 16:52

Ether Nde Limited
No active corporate controller recorded.

Latest accounts

Financial period: 1 Jan 2024 to 31 Dec 2024

FULLACCOUNTS
Turnover
Unknown
Profit / Loss
Unknown
Employees
26

Company events

Reference milestones and recent Companies House filing stream events.

5 events
17 Dec
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

29 Sep
2026

Accounts due

Accounts Due

Next accounts due date

03 Dec
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Dec
2024

Accounts filed

Accounts

Last accounts made up date

05 Dec
2009

Incorporated

Inception

Company registered at Companies House

Public funding

8 awards
First funded
2011
Funded years
2011, 2017, 2018, 2019, 2021, 2022, 2025
Age at first award
1 years

Projects

2025 Collaborative R&D

Sustainable Manufacturing of High-Integrity Aeroengine Components with Excellent Mechanical Properties (SaMurAi)

1 Oct 2025 to 30 Sep 2028

Awarded
£209,116
Total cost £298,738
2022 Collaborative R&D Lead participant

Meeting the needs of Industry for Electrical Conductivity Reference Standards (MIECRS)

1 Oct 2022 to 31 Mar 2023

Awarded
£21,746
Total cost £36,244

Currently NPL only offers AC Electrical Conductivity Standards with a stated accuracy of +/-0.7% of value. The Boeing standard BAC5651 calls for standards above 16.5MS/m to have an accuracy of +/- 0.12MS/m up to 60.5 MS/m (which at the extreme value is +/-0.2%). New Boeing and NIST calibrated standards are no longer available due to national public servic...

2021 CR&D Bilateral

Optimised Welding in High Value Industries - WeldVue

1 Jun 2021 to 31 May 2023

Awarded
£234,048
Total cost £334,354

WeldVue brings together leading innovators from the UK and Turkey with the SMART framework. The objective of the project is to implement advanced AI-based model for automotive parts manufacturing processes, optimisation, and reconfiguration -- Targeting critical welded components. The application of the WeldVue framework in a manufacturing line will resul...

2019 BIS-Funded Programmes

Advanced, couplant free non-destructive testing system for next generation composite parts - CFLUX

1 Aug 2019 to 31 Oct 2021

Awarded
£67,351
Total cost £134,702

The use of composite materials in aerospace manufacture is accelerating fast, with the most modern aircraft in the world's fleet now more than 50% composite materials. These new-generation aeroplanes are lighter, more fuel-efficient, and so more profitable, as well as significantly reducing CO2 emissions compared to traditional aluminium planes. However, ...

2018 Collaborative R&D Lead participant

Smart Residual Stresses Monitoring for Metal Additive Manufacturing – EM-ReSt

1 Apr 2018 to 30 Jun 2021

Awarded
£277,225
Total cost £396,035

"Metal Additive Manufacturing (AM) is an emerging technology for rapid prototype manufacturing, benefitting aerospace and medical devices, as the immediate manufacturing of high-value, complex structured components is usually necessary in these industries. Hence, the structural integrity of printed structures is extremely important and should meet the spe...

2017 Collaborative R&D

SEAMLESS - Digitally-Enabled, Automated Post-Processing for AM

1 May 2017 to 30 Apr 2020

Awarded
£54,260
Total cost £77,514

The SEAMLESS project represents a major technical and commercial advance in the area ofpost processing for additive manufacturing. The poor surface quality for AM parts has been amajor barrier for full process adoption, which will be addressed in this project. The SEAMLESSsolution combines a number of surface finishing and post processing technologies inc...

2011 GRD Proof of Concept Lead participant

WASP (Wide Area Scanning Probe)

1 Nov 2011 to 31 Jul 2013

Awarded
£100,000
Total cost £286,330

Project for assessing the feasibility of manufacturing a flexible eddy current non-destructive testing a wide area probe use array technology.

2011 Feasibility Studies Lead participant

Advanced algorithms for solving real world measurement problems in the application of Eddy Current Conductivity Meters

1 May 2011 to 31 Jul 2011

Awarded
£24,705
Total cost £32,940

Awaiting Public Summary

Product types

BIS-Funded Programmes Collaborative R&D CR&D Bilateral Feasibility Studies GRD Proof of Concept