Company Active LTD

Company profile

Ballard Motive Solutions LTD.

Ballard Motive Solutions LTD. is a UK company with status active founded in 2010.

CRN
07257863
Founded
2010
Age
15

Overview

Legal name
BALLARD MOTIVE SOLUTIONS LTD.
Region
Unknown
Registered address
Unknown
Insolvency history
No

Corporate ownership

Updated 06 Jun 2026 16:52

1 level 1 ultimate controller Controls 1
1
Company Active LTD
Ballard Motive Solutions LTD.
CRN 07257863
2
Direct and ultimate controller
C1087255
CRN C1087255

Company events

Reference milestones and recent Companies House filing stream events.

4 events
25 Oct
2024

Accounts With Accounts Type Full

Accounts Awaiting analysis

AA | Transaction MzQ0MDk1Nzg4OWFkaXF6a2N4

Published 25 Oct 2024 10:49

27 Sep
2024

Appoint Person Director Company With Name Date

Officers

AP01 | Transaction MzQzNzU3MjAzNWFkaXF6a2N4

Published 27 Sep 2024 08:52

27 Sep
2024

Termination Director Company With Name Termination Date

Officers

TM01 | Transaction MzQzNzU3MTk3NGFkaXF6a2N4

Published 27 Sep 2024 08:48

18 May
2010

Incorporated

Inception

Company registered at Companies House

Public funding

24 awards
First funded
2013
Funded years
2013, 2014, 2015, 2017, 2018, 2019, 2020, 2021
Age at first award
2 years

Projects

2021 Small Business Research Initiative Lead participant

Approvals and demonstration of hydrogen infrastructure at depots

1 Nov 2021 to 31 Mar 2022

Awarded
£362,700
Total cost £362,700

The project will support the in-service fleet deployment of hydrogen-powered trains by addressing the design, safety case and approvals for hydrogen refuelling at depots. This project will develop a demonstration and the safety case for a fully integrated hydrogen supply, storage and fast-fill refuelling solution and help establish the principles for regu...

2021 Collaborative R&D Lead participant

Trials, analysis and deployment planning for hydrogen fleets

1 Sep 2021 to 31 Mar 2022

Awarded
£130,911
Total cost £163,639

The project takes a three-fold approach to the deployment of hydrogen transport in the Tees Valley: a demonstration of hydrogen fuel cell electric commercial vehicles, a development of an automated fleet analysis tool, and production of specific fleet deployment plans for zero-emission heavy vehicles. Project partners Arcola Energy and Cenex bring a combi...

2021 Collaborative R&D Lead participant

Hydrogen in the Loop (H2iL) - Innovation in testing and validation for zero emission refuse collection vehicles

1 Aug 2021 to 31 Mar 2022

Awarded
£409,842
Total cost £585,488

The H2iL project focuses on the development of zero emission fuel cell electric refuse collection vehicles (RCVs). The project aims to speed up the introduction of fuel cell electric RCVs and other FCEVs by focussing on improving simulation, validation and testing of this novel technology so that vehicles can be robust, reliable and safe in operation with...

2021 Collaborative R&D Lead participant

Scottish Hydrogen Freight Trial (SHyFT)

1 Aug 2021 to 31 Mar 2022

Awarded
£314,103
Total cost £448,719

The Scottish Hydrogen Fuel-Cell Freight Trail -- ShyFT -- will assess the market opportunity for zero-emission fuel cell electric (FCEV) trucks in key segments of early business adopters looking to decarbonise freight operations in emission sensitive sectors such as forestry; food and drink wholesale, including cold-chain and utilities. The purpose of the...

2021 Collaborative R&D Lead participant

Innovation in control systems for zero emission refuse collection vehicles

1 Jan 2021 to 31 Mar 2021

Awarded
£155,001
Total cost £194,164

Arcola Energy is a leading business in the development of fuel cell electric powertrain systems and integration into heavy duty vehicles. Our powertrain platform is integrated and optimised from tank-to-wheels to provide leading power delivery and energy efficiency. This project will develop innovative control systems for energy management for zero-emissi...

2020 BIS-Funded Programmes Lead participant

Business case for powertrain tier 1 scale up

1 Nov 2020 to 31 Mar 2021

Awarded
£160,757
Total cost £229,653

This feasibility study is focused on the investment case and supply chain opportunities in the manufacture of powertrain systems and subsystems for hydrogen fuel cell electric powertrains for heavy-duty vehicles. Arcola Energy as the UK's leading developer of fuel cell electric powertrains will work with strategy consultancy E4tech to carry out market ana...

2020 Collaborative R&D Lead participant

Powertrain for zero emission HGVs

1 Oct 2020 to 30 Apr 2021

Awarded
£346,760
Total cost £495,372

Arcola Energy has developed hydrogen fuel cell electric (FCEV) powertrains for buses, and integrated and tested on a double deck bus with manufacturer Alexander Dennis (ADL). We have demonstrated the target zero-emissions range of over 200 miles with vehicle mass lower than diesel hybrid buses and well-to-wheel CO2 emissions 30% lower than diesel even on ...

2020 Feasibility Studies Lead participant

Continuation of APC project - Building UK Tier 1 Supply of Powertrains for Zero Emission Buses and Commercial Vehicles

1 Jun 2020 to 30 Nov 2020

Awarded
£249,977
Total cost £487,000

no public description

2019 Innovation Loans Lead participant

Commercialisation of zero emission double deck bus powertrains

15 Feb 2019 to 15 Aug 2021

Awarded
£983,596
Total cost £983,596

Arcola Energy have developed and tested a powertrain for a prototype fuel cell electric double deck bus demonstrating the target zero emissions range of over 200 miles with full passenger carrying capacity and fuel efficiency as good as the current generation of single deck hydrogen buses. This project will continue the development of the powertrain and v...

2019 BIS-Funded Programmes Lead participant

Building UK Tier 1 Supply of Powertrains for Zero Emission Buses and Commercial Vehicles

1 Feb 2019 to 31 Jan 2022

Awarded
£1,330,517
Total cost £2,661,033

"This project will accelerate development and market readiness of zero emission powertrains and components and strengthen UK Tier 1 supply for a wide range of commercial vehicles and buses. It will bring to market complete fuel cell electric powertrains, develop a best-in-class highly integrated motor drive unit, strengthen UK capability in supply of powe...

2018 Feasibility Studies Lead participant

IMproving Power bAttery Cooling Technologies (IMPACT)

1 Mar 2018 to 28 Feb 2019

Awarded
£108,165
Total cost £154,521

"The IMPACT project will address the need for power-dense batteries for low and zero emission hybrid powertrains. Lead partner Arcola Energy is developing zero emission powertrains for buses and commercial vehicles . The project will explore the feasibility of integrating innovative thermal management technologies. Partners Reaction Engines and Flint Engi...

2017 Collaborative R&D Lead participant

Integrated Zero Operation Emissions (iZOE)

1 Jul 2017 to 30 Sep 2018

Awarded
£472,861
Total cost £675,516

This project will deliver a truly zero operational emission bus with an optimised hydrogen fuel cell electric range extended powertrain. Significantly reducing the size of the battery to minimise weight and using a low power fuel cell to reduce costs, providing the optimum system with regards, range, shift duration, cost and weight. Led by Arcola Energy a...

Product types

BIS-Funded Programmes Collaborative R&D Feasibility Studies Innovation Loans Small Business Research Initiative Vouchers