Company Active LTD

Company profile

BPP Cables Limited

BPP Renewables Sustainable Energy Solutions

BPP Cables Limited is a UK company with status active founded in 2010 based in East of England.

CRN
07340211
Founded
2010
Age
15

Overview

Legal name
BPP CABLES LIMITED
Region
East of England
Registered address
BROOM HOUSE 39-43 LONDON ROAD
HADLEIGH
BENFLEET
ESSEX
ENGLAND
SS7 2QL
Insolvency history
No

Corporate ownership

Updated 06 Jun 2026 16:52

1 level 2 ultimate controllers
1
Company Active LTD
BPP Cables Limited
CRN 07340211
2
Direct and ultimate controller Active LTD
3
Direct and ultimate controller
24351012
CRN 24351012

Company events

Reference milestones and recent Companies House filing stream events.

6 events
31 Dec
2026

Accounts due

Accounts Due

Next accounts due date

05 Dec
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

21 Nov
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Mar
2025

Accounts filed

Accounts

Last accounts made up date

05 Nov
2024

Accounts With Accounts Type Total Exemption Full

Accounts Analysed

AA | Transaction MzQ0MjAxNjI2MGFkaXF6a2N4

Published 05 Nov 2024 09:59

09 Aug
2010

Incorporated

Inception

Company registered at Companies House

Public funding

5 awards
First funded
2021
Funded years
2021, 2022, 2024
Age at first award
10 years

Projects

2024 Feasibility Studies Lead participant

Design of a solar-hydrogen production system in Central Visayas to provide fossil-free power and oxygen to a rural hospital facility

1 Jun 2024 to 31 Mar 2025

Awarded
£83,807
Total cost £119,724

This project brings together BPP-Renewables (UK, Lead Applicant), FutureValue (Australia, Project Partner) and Climate Foundation Inc. (Philippines, Subcontractor) to develop a high-level design for solar-hydrogen storage alternatives to carbon-emitting fossil fuel energy, with clean water and oxygen production, for the Garcia Memorial Provincial Hospital...

2024 Collaborative R&D Lead participant

Identify and test an appropriate solar-energy storage mechanism for remote households deployment in rural communities of Papua New Guinea

1 May 2024 to 31 Oct 2025

Awarded
£251,953
Total cost £359,933

This project brings together BPP Renewables (UK) and Pacific Sterling Limited (Papa New Guinea) to identify the most appropriate energy storage mechanism for rural communities in Indo-Pacific countries, with a case study being developed for Irimuku Village, Kikori District, Gulf Province, a rural community in PNG. This project aims to improve the electrif...

2022 Collaborative R&D Lead participant

Advanced Materials and Manufacture of High Voltage AC and DC Power Cables for Deepwater Offshore Wind Applications

1 Dec 2022 to 30 Nov 2024

Awarded
£339,241
Total cost £484,630

Power generation from offshore wind is subject to harsher environments than onshore wind, which can cause greater challenges for the reliability of critical infrastructure. One asset that is fundamental to the economic success of an offshore wind farm is the subsea cable transmission infrastructure. This includes inter-array and export cables, failure of ...

2021 Feasibility Studies Lead participant

OptiH2float, a software platform that supports comprehensive floating wind farm (FWF) design for green hydrogen (H2) production on a bulk scale

1 Oct 2021 to 31 Mar 2023

Awarded
£332,185
Total cost £474,550

This project brings together BPP-Cables and Logan Energy, experts in offshore cabling and H2 production respectively, to produce OptiH2float. OptiH2float is an end-to-end floating wind farm (FWF) design and H2 production optimisation tool. By inputting data concerning weather conditions, shore distance, FWF size, and more, OptiH2float will provide users w...

2021 Collaborative R&D

Holistic Subsea Cable Fault Detection & Condition Monitoring System

1 May 2021 to 31 Dec 2022

Awarded
£208,566
Total cost £297,952

Power generation from offshore wind is subject to harsher environments than onshore wind, which can cause greater challenges for the reliability of critical infrastructure. One asset that is fundamental to the economic success of an offshore wind farm is the subsea cable infrastructure. This includes intra-array and export cables, failure of which will le...

Product types

Collaborative R&D Feasibility Studies