Company Active LTD

Company profile

Performance Engineered Solutions (Pes) Limited

PES Performance engineering design consultancy; research & developm't

PES Performance: an engineering design consultancy using advanced design, materials, manufacturing, research & development technologies.

CRN
07525806
Founded
2011
Age
15

Overview

Legal name
PERFORMANCE ENGINEERED SOLUTIONS (PES) LIMITED
Region
East Midlands
Registered address
SUITE 500, UNIT 2
94A WYCLIFFE ROAD
NORTHAMPTON
NORTHAMPTONSHIRE
NN1 5JF
Insolvency history
No

Corporate ownership

Updated 06 Jun 2026 16:52

Performance Engineered Solutions (Pes) Limited
No active corporate controller recorded.

Company events

Reference milestones and recent Companies House filing stream events.

9 events
31 Dec
2026

Accounts due

Accounts Due

Next accounts due date

09 Apr
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

31 Mar
2025

Accounts filed

Accounts

Last accounts made up date

26 Mar
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

12 Sep
2024

Accounts With Accounts Type Total Exemption Full

Accounts Awaiting analysis

AA | Transaction MzQzNTUzMDgwMmFkaXF6a2N4

Published 12 Sep 2024 17:26

07 Aug
2024

Change To A Person With Significant Control

Persons-with-significant-control

PSC04 | Transaction MzQzMTUxNzk1NWFkaXF6a2N4

Published 07 Aug 2024 15:29

07 Aug
2024

Change To A Person With Significant Control

Persons-with-significant-control

PSC04 | Transaction MzQzMTUxNzk1N2FkaXF6a2N4

Published 07 Aug 2024 15:29

07 Aug
2024

Change Person Director Company With Change Date

Officers

CH01 | Transaction MzQzMTUxNzk0N2FkaXF6a2N4

Published 07 Aug 2024 15:29

10 Feb
2011

Incorporated

Inception

Company registered at Companies House

Public funding

4 awards
First funded
2015
Funded years
2015, 2018, 2021
Age at first award
4 years

Projects

2021 BIS-Funded Programmes

HIPNOTIC TRL6

1 Oct 2021 to 31 Mar 2023

Awarded
£96,963
Total cost £138,519

The project will take Powder Metallurgy Hot Isostatic Press (PM/HIP) through the commercialisation "valley of death" to complete Technology Readiness Levels (TRL) 4 through 6 critical process criteria, as set by AIRBUS. PM/HIP is a Near Net Shape technology and provides a method for manufacturing large complex designs, reduces wasted material by drastical...

2018 Collaborative R&D

Metal Composite Hybrids for Lightweighting

1 Jul 2018 to 30 Jun 2021

Awarded
£94,604
Total cost £135,168

Reduction of emissions requires weight reduction in vehicle components regardless of whether these emissions occur at the tailpipe or at the power station. Weight reduction also increases the distance over which a vehicle can travel without refueling or recharging the battery; or, allowing for a greater payload over an identical distance. It is widely rec...

2018 Collaborative R&D

Leading Edge For Turbines (LEFT)

1 Apr 2018 to 31 Dec 2020

Awarded
£189,704
Total cost £271,006

"This project aims at maturing to TRL 5 a game changing erosion protection solution for large offshore wind turbine blades utilising a technology currently produced for the aerospace industry, namely that of the metallic lifetime erosion protection shield. In order to integration this solution in large 80m+ 30ton+, highly flexible wind turbine blades with...

2015 Collaborative R&D

Development of Lightweight Composite Suspension Components

1 Jul 2015 to 30 Jun 2017

Awarded
£48,583
Total cost £80,972

The objective is to design and manufacture a range of high performance lightweight suspension components for heavy commercial vehicles. Use of composite materials unlocks the potential for significant weight reduction compared to existing steel designs. This project aims to deliver strong technical and environmental benefits such as components with increa...

Product types

BIS-Funded Programmes Collaborative R&D