Company Active LTD

Company profile

Kwikbolt Limited

Kwikbolt | Single Sided Temporary Fastener | Home

Kwikbolt is Revolutionary Single Sided (Blind) Temporary Fastener suppling to the Aerospace and Defence industry. Quality durable automated fit, quick realease aerospace fasteners available globally.

CRN
07853841
Founded
2011
Age
14

Overview

Legal name
KWIKBOLT LIMITED
Region
South East England
Registered address
THE STABLES MONEYS FARM
MATTINGLEY
HOOK
HAMPSHIRE
ENGLAND
RG27 8LJ
Insolvency history
No

Latest accounts

Financial period: 1 Dec 2023 to 30 Nov 2024

FILLETEDACCOUNTS
Turnover
Unknown
Profit / Loss
Unknown
Employees
7

Company events

Reference milestones and recent Companies House filing stream events.

6 events
19 May
2027

Confirmation statement due

Confirmation Due

Next confirmation statement due date

31 Aug
2026

Accounts due

Accounts Due

Next accounts due date

05 May
2026

Confirmation statement filed

Confirmation

Last confirmation statement made up date

30 Nov
2024

Accounts filed

Accounts

Last accounts made up date

15 Aug
2024

Accounts With Accounts Type Micro Entity

Accounts Analysed

AA | Transaction MzQzMjM0MDUyOWFkaXF6a2N4

Published 15 Aug 2024 10:35

21 Nov
2011

Incorporated

Inception

Company registered at Companies House

Public funding

3 awards
First funded
2014
Funded years
2014, 2015, 2020
Age at first award
2 years

Projects

2020 BIS-Funded Programmes Lead participant

Robotic end-effector system for fully flush fasteners

1 Dec 2020 to 31 May 2022

Awarded
£105,000
Total cost £210,000

Kwikbolt's objective is to design, develop and prototype a bespoke demonstrator end-effector and robotic system to be used to install and remove fully flush temporary fasteners, required in the production line manufacturing process of aerospace components. The deliverables will include a prototyped end effector that interfaces with an industry standard ro...

2015 GRD Proof of Concept Lead participant

The testing and demonstration of a slave fastener manufactured using the Metal Injection Moulding process as required for large volume manufacturing.

1 May 2015 to 31 Oct 2016

Awarded
£66,870
Total cost £111,450

This SMART grant scheme is a proof of concept study to investigate the use of maraging steel powder within the metal injection moulding process. Thus proving a significant cost saving is possible during large volume production whilst maintaining the advanced properties of the material.

2014 Feasibility Studies Lead participant

The development of maraging steel components within the aerospace industry using an adapted metal injection molding process

1 Aug 2014 to 30 Nov 2014

Awarded
£6,188
Total cost £8,250

This technology inspired innovation competition is for a feasibiltiy study into the possibility of producing an advanced material by the process of additive manufacture. Resulting in a production process that is able to provide a more competitive product that maintains exceptional properties more efficiently with less wastage and reduced energy consumptio...

Product types

BIS-Funded Programmes Feasibility Studies GRD Proof of Concept