Company Active PRIVATE-LIMITED-GUARANT-NSC

Company profile

Energy Systems Catapult Limited

Net Zero Energy Innovation | Energy Systems Catapult

Energy Systems Catapult was set up to accelerate Net Zero energy innovation. Access energy research, green business support, clean tech information & more.

CRN
08705784
Founded
2013
Age
12

Overview

Legal name
ENERGY SYSTEMS CATAPULT LIMITED
Region
Unknown
Registered address
7TH FLOOR
18 THE PRIORY QUEENSWAY
BIRMINGHAM
UNITED KINGDOM
B4 6BS
Insolvency history
No

Corporate ownership

Updated 06 Jun 2026 16:52

Energy Systems Catapult Limited
No active corporate controller recorded.

Company events

Reference milestones and recent Companies House filing stream events.

6 events
17 Feb
2027

Confirmation statement due

Confirmation Due

Next confirmation statement due date

31 Dec
2026

Accounts due

Accounts Due

Next accounts due date

03 Feb
2026

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Mar
2025

Accounts filed

Accounts

Last accounts made up date

17 Oct
2024

Accounts With Accounts Type Group

Accounts PDF pending

AA | Transaction MzQzOTMzNzUyNmFkaXF6a2N4 | Paper/PDF filed

Published 18 Oct 2024 11:54

25 Sep
2013

Incorporated

Inception

Company registered at Companies House

Public funding

53 awards
First funded
2015
Funded years
2015, 2016, 2017, 2018, 2019, 2020, 2021, 2022, 2023, 2024, 2025, 2026
Age at first award
1 years

Projects

2026 Feasibility Studies

BioCapMap

1 Jan 2026 to 31 May 2026

Awarded
£75,130
Total cost £83,478

**BioCapMap** is a Strategic Innovation Fund Discovery project led by Cadent, with Bohr Energy and Energy Systems Catapult. It will unlock the UK's biomethane potential by developing a digital, self-service tool that helps developers identify optimal gas network connection points, being the first of kind to solve this gap in the connections planning proce...

2025 Collaborative R&D

Enhancing the viability of low carbon heat networks

1 Dec 2025 to 31 Mar 2026

Awarded
£54,387
Total cost £54,387

The project aims to accelerate Belfast's transition to Net Zero by further developing, embedding and scaling delivery pathways for a city-centre heat network and rooftop solar. These were identified as priority interventions during modelling of the City's energy system in the Local Area Energy Plan (LAEP) but are currently constrained by a series of non-t...

2025 Collaborative R&D

Future Operability of Gas for System Integration (FOGSI)

1 Jul 2025 to 31 Dec 2025

Awarded
£53,017
Total cost £58,908

The project will develop an integrated hierarchical network modelling framework for simulating the operation of future GB energy system scenarios with highly interconnected gas and power networks. The realistic modelling of power-to-gas and storage operators' behaviour will be emphasised. The integrated models will be demonstrated on a simulation platform...

2025 Feasibility Studies

Future Agriculture Resilience Mapping FARM

1 Jun 2025 to 30 Sep 2025

Awarded
£60,064
Total cost £66,738

_To achieve clean power by 2030 and Net Zero by 2050, UK food production must move away from fossil fuels. With approximately 209,000 farm holdings in 2023, energy networks must adapt prepared to meet different future rural energy demands driven by greenhouse gas reductions and climate change adaptation._ _The Future Agriculture Resilience Mapping (FARM) ...

2025 Feasibility Studies

Conductor

1 May 2025 to 31 Aug 2025

Awarded
£59,760
Total cost £66,400

Traction Bulk Supply Points are large capacity grid connections designed to support peak demand on the rail traction system. Because traction power is typically very peaky in nature this capacity is not optimally utilised. Installing battery storage facilities at traction BSPs and unlocking connection agreements to enable two-way dynamic flow could shift ...

2025 Collaborative R&D

Hydrogen Innovation Initiative Bridge - HIIBRIDGE

1 Apr 2025 to 31 Mar 2026

Awarded
£505,000
Total cost £505,000
2025 Collaborative R&D Lead participant

Ofgem SIF Network innovation incubator/accelerator direct award

1 Jan 2025 to 31 Mar 2025

Awarded
£123,120
Total cost £123,120
2024 EU-Funded

Building Energy Flexibility at Scale for Trading and Earning of Revenues. (BE FASTER)

1 Dec 2024 to 28 Feb 2027

Awarded
£107,403
Total cost £107,403
2024 Demonstrator

Belfast Net Zero Pathfinder

1 Jun 2024 to 31 May 2025

Awarded
£58,120
Total cost £58,120

Belfast City Council (BCC) have commissioned two strategic energy masterplans for the local area to achieve a cost effective and socially just net zero energy system whilst realising co-benefits for the local stakeholders. 1.Belfast Local Area Energy Plan (LAEP) 2.Queens Island Decarbonisation Plan (QIDB) These plans are innovative because they take a who...

2024 Demonstrator

Retrofit One-Stop-Shop York

1 Mar 2024 to 30 Nov 2025

Awarded
£1,451,608
Total cost £1,451,608

Our Phase 1 project, Accelerating York's Net Zero Transition identified significant non-technical barriers to consumer acceptance and uptake of retrofit and low carbon technologies. This proposal directly builds on those findings, by combining innovative approaches to place-based engagement, digital tools and data systems, tailored training and advice bes...

2024 Demonstrator

Leicestershire CAN (Collaborate to Accelerate Net Zero): Demonstrator

1 Mar 2024 to 30 Nov 2025

Awarded
£1,206,270
Total cost £1,206,270

Leicestershire CAN (Collaborate to Accelerate Net Zero): Demonstrator will create an environment for well-planned, deliverable, impactful place-based net zero interventions in Leicestershire, replicable to other LA areas. Comprising 4 interconnected work packages, CAN-De will lay the foundations for successful delivery: * Governance: Developing, piloting ...

2024 Demonstrator

Peterborough Accelerated Net Zero (PANZ) Demonstrator

1 Mar 2024 to 30 Nov 2025

Awarded
£403,971
Total cost £403,971

Peterborough City Council is embarking on an innovative approach to manage and reduce non-technical barriers that are hampering the ability to deliver net-zero initiatives at scale and speed. At the heart of our net-zero strategy lies the implementation of an ambitious and comprehensive plan spanning heat, electricity, and transport. However, to translate...

Product types