Company Active LTD

Company profile

Smartflow Couplings Ltd

Smartflow Couplings - UK Dry Break Coupling Design and Engineering

Smartflow have designed a full range of dry break couplings to improve the efficiency and safety of fluid transfer systems

CRN
09888120
Founded
2015
Age
10

Overview

Legal name
SMARTFLOW COUPLINGS LTD
Region
Yorkshire and the Humber
Registered address
UNIT E23 THE ENTERPRISE VILLAGE
PRINCE ALBERT GARDENS
GRIMSBY
NORTH EAST LINCOLNSHIRE
UNITED KINGDOM
DN31 3AT
Insolvency history
No

Corporate ownership

Updated 06 Jun 2026 16:52

1 level 1 ultimate controller
1
Company Active LTD
Smartflow Couplings Ltd
CRN 09888120
2
Direct and ultimate controller Active LTD
Cejn UK Limited
CRN 07125622

Company events

Reference milestones and recent Companies House filing stream events.

8 events
30 Dec
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

30 Sep
2026

Accounts due

Accounts Due

Next accounts due date

16 Dec
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Dec
2024

Accounts filed

Accounts

Last accounts made up date

10 Oct
2024

Default Companies House Service Address Applied Officer

Address

RP09 | Transaction MzQzOTAxMDAxOGFkaXF6a2N4

Published 11 Oct 2024 12:56

30 Sep
2024

Accounts With Accounts Type Total Exemption Full

Accounts Analysed

AA | Transaction MzQzNzc3NDA4MmFkaXF6a2N4

Published 30 Sep 2024 03:15

11 Sep
2024

Mortgage Create With Deed With Charge Number Charge Creation Date

Mortgage

MR01 | Transaction MzQzNTI5MzQwOWFkaXF6a2N4

Published 02 Oct 2024 01:54

25 Nov
2015

Incorporated

Inception

Company registered at Companies House

Public funding

7 awards
First funded
2020
Funded years
2020, 2022, 2023
Age at first award
4 years

Projects

2023 Collaborative R&D Lead participant

FEA Simulation and Verification of Composite Pipeline End Fittings for Hydrogen and CCUS service

1 Jul 2023 to 31 Dec 2023

Awarded
£49,103
Total cost £81,839

With the increasing demand for the distribution of Hydrogen and Carbon Dioxide for Underground Storage, the challenges associated with end connections in composite pipelines are becoming a critical concern for manufacturers. Smartflow has extensive design & manufacturing expertise in this niche industry, supported by physical pipe testing capabilities. Ho...

2023 Collaborative R&D Lead participant

Computerised simulation of composite pipe connections for hydrogen service

1 Jan 2023 to 31 Mar 2023

Awarded
£19,980
Total cost £19,980

Although Smartflow have extensive expertse in the niche industry of pipe end connections and can back it up with physical pipe testing, some clients do request more scientific answers. As different materials are used to form these metal connections into polymer pipes, the characteristics of these 'raw' metals can change. This could include mechanical and ...

2022 EU-Funded Lead participant

IOT-SFC

1 Oct 2022 to 30 Sep 2024

Awarded
£224,894
Total cost £374,824
2022 Collaborative R&D Lead participant

Flow rate improvement on safety fluid transfer couplings for energy sector

1 Oct 2022 to 31 Mar 2023

Awarded
£47,510
Total cost £79,184

The goal of this project is to significantly improve the flow rate of fluid through the larger sized self sealing safety couplings (Dry Break Couplings) within Smartflow's product range. This will propel Smartflow to the forefront of dry break coupling design and manufacture and open up further potential applications for these couplings where reduced flow...

2022 Collaborative R&D Lead participant

Enhanced Flow, Pressure and Reliability Analysis of High-Flow safety couplings

1 Jan 2022 to 31 Mar 2022

Awarded
£27,239
Total cost £27,239

The main focus of the analysis project would be to 'over-test' the products in elevated lab tests to show that there has been no detrimental effects on the products. We have carried out internal testing on current and new products to the minimum required standards, this is mainly around hydrostatic pressure tests with water. The intention of the analysis ...

2020 Feasibility Studies Lead participant

Continuity of analysis/testing of couplings A4I project

1 Jun 2020 to 30 Nov 2020

Awarded
£29,053
Total cost £29,053

no public description

2020 Collaborative R&D Lead participant

Reliability, durability and flow analysis of spill prevention couplings

1 Feb 2020 to 30 Apr 2021

Awarded
£69,615
Total cost £99,450

Smartflow Couplings are a small team of mechanical engineers with experience in industrial coupling design, for oil & gas, chemical sectors in particular. They have been trading a variation of their range of products over the past 3 years and gradually building up to a good level of business. They have invested in product development in these past 3 years...

Product types

Collaborative R&D EU-Funded Feasibility Studies