Company profile
Glass Futures Ltd
Home | Glass Futures
Glass Futures Ltd is a UK company with status active founded in 2016 based in North West England.
Latest accounts
Financial period: 1 Mar 2024 to 28 Feb 2025
Company events
Reference milestones and recent Companies House filing stream events.
Confirmation statement due
Confirmation DueNext confirmation statement due date
Accounts due
Accounts DueNext accounts due date
Change To A Person With Significant Control
Persons-with-significant-controlPSC04 | Transaction MzUyMzI5Nzk0OGFkaXF6a2N4
Published 26 May 2026 09:26
Replacement Filing Of Director Appointment With Name
OfficersRP01AP01 | Transaction MzUxMzkyMDY1M2FkaXF6a2N4 | Paper/PDF filed
Published 08 Apr 2026 22:46
Confirmation statement filed
ConfirmationLast confirmation statement made up date
Appoint Person Director Company With Name Date
OfficersAP01 | Transaction MzQ3MzE1NjMzM2FkaXF6a2N4 | Paper/PDF filed
Published 03 Apr 2026 00:32
Accounts filed
AccountsLast accounts made up date
Confirmation Statement With No Updates
Confirmation-statementCS01 | Transaction MzQ1NTcwNzcyMWFkaXF6a2N4
Published 19 Feb 2025 04:47
Appoint Person Director Company With Name Date
OfficersAP01 | Transaction MzQ0NDI5MTE4MmFkaXF6a2N4
Published 20 Nov 2024 02:33
Termination Director Company With Name Termination Date
OfficersTM01 | Transaction MzQ0NDExMTQ2NWFkaXF6a2N4
Published 19 Nov 2024 12:54
Termination Director Company With Name Termination Date
OfficersTM01 | Transaction MzQzMTY0ODc4NWFkaXF6a2N4
Published 08 Aug 2024 19:15
Incorporated
InceptionCompany registered at Companies House
Public funding
Projects
Glass Futures Innovation Loan
12 Mar 2026 to 12 Mar 2028
Glass Futures Limited (GFL) was established to tackle a critical challenge: the lack of an open-access, industrial-scale facility to test and validate low-carbon technologies under real-world conditions. Glass manufacturing is one of the world's most energy-intensive processes, traditionally reliant on fossil fuels. With increasing regulatory and consumer...
Foundation Industries Ventures (FIVe) S&IN
1 Mar 2024 to 31 Aug 2024
The Foundation Industries (FIs) metals, glass, ceramics, cement, chemicals, and paper are vital to the UK manufacturing and construction sectors. Approximately 75% of the materials we see around us have been made by one of these six industries and moving towards 2050, we need to rapidly address the challenges brought about by climate change, and the need ...
Economic Material Innovation for Sustainable and Efficient use of Resources 2 (EconoMISER 2)
1 Jan 2024 to 31 Mar 2026
CO2 Routes Across Europe (COREU)
1 Jan 2024 to 31 Dec 2027
COREu will demonstrate key enabling technologies in a CCS value chain and support the development of three new CCS routes in Central-East Europe (CEE), helping accelerate CCS development . COREu will (a) provide the means for development of an open-access, trans-national network (infrastructure and logistic) to connect emitters with storage sites in Europ...
Hydrogen and Value-Added-Carbon production through Waste Heat Recovery: Hy-Value Recovery
1 Nov 2022 to 31 Oct 2024
This collaborative project will develop, build and operate an industry scale demonstrator, the Torstran Production Demonstrator. It will use waste heat from steel and glass manufacturing to convert renewable/waste methane into hydrogen for use as a process chemical in steel and glass manufacturing. The Torstran Production Demonstrator also produces a high...
Material Innovation for Sustainable and Efficient use of Resources (MISER)
1 Oct 2022 to 31 Mar 2024
Intelligent Robotic Inspection for Foundation Industry Optimisation demonstration - IRIFIO:D2
1 Oct 2022 to 30 Sep 2024
This collaborative, cross sector R&D demonstration project furthers previous industrial research to advance & showcase novel technology developed to support transformation of Foundation Industry production process optimisation. The primary aim is to increase efficiency to achieve greater productivity by increased energy and resource efficiency. This will ...
3DCarbide
1 Apr 2022 to 31 Mar 2023
In order for the UK to be carbon neutral by 2050, the country will have to widen the use of materials that provide exceptional benefits. To do this we need bold, game-changing innovations to be applied to our most energy consuming industries. This project will do just that by enabling the wider use of ceramics and thus enabling their energy saving propert...
Enhanced Ground Granulated Blast Furnace Slag for use in glass and cement sectors (e-GGBS)
1 Feb 2022 to 31 Mar 2022
This project brings together partners from glass (Glass Futures, Encirc, Calumite, Glass Technology Services, Diageo), steel (British Steel, the Materials Processing Institute, Tata Steel) and cement (LKAB Minerals, Hanson) sectors to develop a novel process to combine waste-materials into blast furnace slag to 'up-grade' low-quality materials into an enh...
CMCs for low energy kiln furniture: CMC Energy
1 Feb 2022 to 31 Jan 2023
Almath Crucibles Ltd manufactures and supplies ceramic products to a range of industries for their kiln and furnace processes. The environmental sustainability of kiln and furnace processes can be improved by reducing the total heat energy consumed in each run of the equipment, which can be achieved by using furnace furniture with lower mass and equivalen...
UK-India Lab to Lab collaboration in Glass Manufacturing and Research
1 Nov 2021 to 31 Mar 2022
Glass is a reusable and recyclable material for windows and a reusable and recyclable alternative to plastic for containers. Sustainable glass is manufactured by melting sand in exceptionally large (the size of a low-rise block of flats), high temperature furnaces. However, the manufacturing process is very inefficient and up to 50% of the energy supplied...
Deployment of End to End Process Control for Encirc’s Elton site (DEEP Control)
1 Apr 2021 to 30 Sep 2023
The 'Deployment of End to End Process Control for Encirc's Elton site (DEEP Control)' project will deliver energy savings through deployment of new end-to-end control systems linking processes across the two Encirc Elton container-glass furnaces and associated 14 forming lines to facilitate: 1. Optimisation of furnaces to run at minimum energy whilst main...