Scottish Hydro Electric Power Distribution PLC

UK company SC213460, incorporated on 4 December 2000.

Scottish and Southern Electricity Networks - SSEN

Our contact centres are open 24 hours a day, 365 days a year, ready to help you when you need it most. Call us on 105 or use our Power Track map to view, report, and stay notified about power cuts in your area.

Company number
SC213460
Incorporated
4 Dec 2000
Companies House status
Active

Company identity

Founded / incorporated
4 December 2000

Company number SC213460

Verify at Companies House
Legal name
SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC
Company type
Public Limited Company
Region
Scotland
Registered address
INVERALMOND HOUSE
200 DUNKELD ROAD
PERTH
PH1 3AQ
Insolvency history
No

Company events

Reference milestones and recent Companies House filing stream events.

7 events
15 Nov
2026

Confirmation statement due

Confirmation Due

Next confirmation statement due date

30 Sep
2026

Accounts due

Accounts Due

Next accounts due date

01 Jul
2026

Appoint Person Director Company With Name Date

Officers

AP01 | Transaction MzUyOTgzMDczM2FkaXF6a2N4

Published 01 Jul 2026 14:32

01 Jul
2026

Termination Director Company With Name Termination Date

Officers

TM01 | Transaction MzUyOTg1MTY1MWFkaXF6a2N4

Published 01 Jul 2026 13:14

01 Nov
2025

Confirmation statement filed

Confirmation

Last confirmation statement made up date

31 Mar
2025

Accounts filed

Accounts

Last accounts made up date

04 Dec
2000

Incorporated

Inception

Company registered at Companies House

Public funding

17 awards
First funded
2013
Funded years
2013, 2023, 2024, 2025, 2026
Age at first award
12 years

Projects

2026 Feasibility Studies Lead participant

CREOS-OUT

1 Feb 2026 to 31 May 2026

Awarded
£32,234
Total cost £35,815

Creosote is a tar-based wood preservative used to protect utility poles, but it is also an environmental contaminant that can leach into soil and water, posing serious health and ecological risks. The UK energy network utilises creosote-treated poles for overhead-line distribution due to their long service life, with SSEN operating over 1 million and repl...

2025 Collaborative R&D Lead participant

VERIFY - Vulnerability Evaluation for Resilience Investment and Flexibility

1 Oct 2025 to 30 Sep 2028

Awarded
£1,172,292
Total cost £1,302,547

As society moves towards Net Zero, some people will easily participate in the energy transition, others, either by choice or factors outside their control, will not. To ensure an equitable transition, energy networks need to cater for all consumers. For the first time, VERIFY will combine data on networks, properties, consumer demographics and smart meter...

2025 Collaborative R&D Lead participant

Dynamic, data driven asset rating (3DAR)

1 Oct 2025 to 31 May 2026

Awarded
£82,711
Total cost £91,901

As electricity networks face growing pressure for connections, the need for smarter, faster, and more flexible network solutions becomes essential. Dynamic Rating (DR) allows electricity network assets, particularly overhead lines, to operate closer to their real-time thermal capacity by accounting for environmental conditions. Dynamic, Data Driven Asset ...

2025 Collaborative R&D Lead participant

Data to Insights D2I

1 Jun 2025 to 30 Nov 2025

Awarded
£91,334
Total cost £101,482
2025 Feasibility Studies Lead participant

Future Agriculture Resilience Mapping FARM

1 Jun 2025 to 30 Sep 2025

Awarded
£16,687
Total cost £18,541

_To achieve clean power by 2030 and Net Zero by 2050, UK food production must move away from fossil fuels. With approximately 209,000 farm holdings in 2023, energy networks must adapt prepared to meet different future rural energy demands driven by greenhouse gas reductions and climate change adaptation._ _The Future Agriculture Resilience Mapping (FARM) ...

2025 Feasibility Studies Lead participant

FORTRESS ( Flexibility and Optimisation for Resilience in Energy Systems)

1 May 2025 to 31 Aug 2025

Awarded
£38,237
Total cost £42,486

It is essential that Protected Sites (PSs), e.g. hospitals and military sites, have a resilient energy supply to meet critical requirements. Most protected sites currently use fossil-fuels for heat and backup solutions. For Distribution Network Operators (DNOs), supporting protected sites' transition to electrified heating will require providing additiona...

2025 Collaborative R&D Lead participant

Equal LCT

1 Feb 2025 to 31 Jul 2025

Awarded
£41,040
Total cost £45,600

To meet the demand that heat pumps and other LCTs will place on the network significant reinforcement will be required, it is critical that the cost of scale of this is managed effectively. EqualLCT will accelerate the roll out of heat pumps combined alongside energy efficiency and flexibility products to facilitate the transition to net zero while also e...

2025 Feasibility Studies Lead participant

Dynamic, data driven asset rating (3DAR)

1 Feb 2025 to 31 May 2025

Awarded
£31,870
Total cost £35,411

With increasing demand for both electrification and renewables connections, many areas of the distribution network are approaching their capacity and will need intervention. Traditionally, DNOs can reinforce the network or procure flexibility services to meet these peaks. These are costly solutions that can have long lead times. By leveraging dynamic asse...

2025 Feasibility Studies Lead participant

RIDES

1 Feb 2025 to 30 Apr 2025

Awarded
£29,003
Total cost £32,225

As rural industries decarbonise, they may find this transition challenging. This is where Network operators can provide valuable support to help them make the right decisions. Rural networks are often characterised by radial circuits with limited capacity. These circuits are harder and more expensive to reinforce. RIDES will develop a tool to show rural i...

2024 Collaborative R&D

Multi Resilience

1 Oct 2024 to 30 Jun 2028

Awarded
£66,744
Total cost £74,160

no public description

2024 Grant for R&D

Digital Twin Energy Grids

1 Oct 2024 to 30 Sep 2025

Awarded
£0
Total cost £0

A Digital Twin for Energy Grids

2024 Feasibility Studies Lead participant

SeaChange

1 Mar 2024 to 31 May 2024

Awarded
£0
Total cost £23,698

Product types

Collaborative R&D Feasibility Studies Grant for R&D