Company profile
Act Blade Limited
ACT Blade The Innovative Light blade
Act Blade Limited is a UK company with status active founded in 2015 based in Scotland.
Latest accounts
Financial period: 1 Apr 2024 to 31 Mar 2025
Company events
Reference milestones and recent Companies House filing stream events.
Accounts due
Accounts DueNext accounts due date
Confirmation statement due
Confirmation DueNext confirmation statement due date
Confirmation statement filed
ConfirmationLast confirmation statement made up date
Accounts filed
AccountsLast accounts made up date
Cessation Of A Person With Significant Control
Persons-with-significant-controlPSC07 | Transaction MzQzNjIxNzUxMGFkaXF6a2N4
Published 17 Sep 2024 14:15
Confirmation Statement With Updates
Confirmation-statementCS01 | Transaction MzQzNjIxNzQxMWFkaXF6a2N4
Published 17 Sep 2024 14:14
Accounts With Accounts Type Total Exemption Full
Accounts AnalysedAA | Transaction MzQzMjc2MzUzOGFkaXF6a2N4
Published 20 Aug 2024 14:22
Incorporated
InceptionCompany registered at Companies House
Public funding
Projects
1_2018_IP162_ACT blades - Towards the commercialization of the ACT Blades technology
1 Jun 2022 to 31 May 2023
no public description
Towards commercialisation of the ATC Blade Technology
1 Jan 2022 to 30 Jun 2022
Delivering the lightweight ACT Blade to reduce LCOE by 7%
1 Jun 2020 to 30 Nov 2020
no public description
Design, manufacturing method and prototype testing of an extremely lightweight Offshore Wind blade
1 Jan 2019 to 31 Dec 2020
The ACT Blade is a modular textile-based composite offshore wind turbine blade. It has a patented innovative manufacturing process that will provide lighter wind turbine blades leading to increased energy production and a decreased the levelised cost of energy (LCOE). In addition, the patent-pending load control system is able to increase blade efficiency...
Extra-light and sustainable textile wind turbine blade
1 Mar 2017 to 30 Jun 2018
Awaiting Public Project Summary
Engineered Textile Blade with Actively Controlled surface/profile
1 Oct 2016 to 31 Mar 2019
This project seeks to develop, test and verify in simulated environments a prototype of the innovative ACT Blade. It follows on from an Early Stage Catalyst project that successfully validated the potential energy production gains (+9.7%) in wind power generation and the reduction in the levelised cost of energy (-8.7%) associated with the innovative blad...