Coming Soon

Public Funding for Innova Limited

Registration Number 04052391

In-Stream Turbine

99,300
2012-01-01 to 2013-06-30
GRD Proof of Concept
Although the turbine could be used in river and even ocean currents, the most immediate potential use is in tidal streams. The British Isles are surrounded by millions of tons of moving water twice per day, with concentrations in the Pentland Firth, the Channel Islands, and many localised sites. There is no market yet, but the need for tidal power is well recognised - it is probably the cleanest and certainly the most reliable form of renewable energy. Once our turbine is established, there is a potential worldwide market of many billions of pounds. Other stream turbines are marginally economic, at best, only in absolutely optimal sites, but even then they have to be considered wasteful because it is simply not possible for any of them to maximise the resource (e.g: 8% max possible extraction vs 20% 'allowable' by environmental standards). It is easiest to provide an example from a specific case study that we have carried out for the Corran Narrows in Loch Linnhe, NW Scotland. Here the tide is 'only' some 1.3 metres/sec root mean cube velocity (rmcv) and is considered uneconomic by MCT, the longestestablished tidalstream developer. However, Corran is a very sheltered site that borders the A82 and a major power line is already in place, so, without affecting the leisure boat traffic, an initial investment of only £5m would produce annual profits of some £11.5m. It represents a Net Present Value of £110m at a discount rate of 7%. All figures derived from a DTI study by Edinburgh University and the Government ROC (Renewables Obligation Certificates) scheme. All of this with minimal harm to the underwater environment or the visual amenity - only a few pontoons would be showing. So, the opportunity is undoubtedly there once we can prove the concept and produce meaningful amounts of electricity from a prototype. There will obviously be technical problems to be overcome but the main difficulties have usually been environmental (see Severn Barrage). Our turbine is very acceptable environmentally, and socially with the promise of local jobs and a devolved power supply.

Get notified when we’re launching.

Want fast, powerful sales prospecting for UK companies? Signup below to find out when we're live.